This is the template every developer's public page follows, shown with a fictional project. A real page carries the project's registered name and its RERA number as supplied by the developer and checked on the state RERA website.
Verification activeMethod v1.0Measured 10 working days, 3 to 14 Aug
| Destination | Mode | Typical | Bad day | Field verified |
|---|---|---|---|---|
| Northgate Tech Park | Car | 47 min | 68 min | Yes |
| Sunbeam Public School | Car, drop off | 17 min | 24 min | Yes |
| Varnapur Metro station | Walk | 11 min | 13 min | Not needed (walk) |
Weekday 8:15 to 9:15 am, 10 working days, 3 to 14 Aug. Typical is the median; bad day is the 90th percentile. Start point: Gate 2, east side.
Developer's note
A shuttle to Northgate Tech Park runs from Gate 1 on weekdays.
Notes are written by the developer and cannot change measured numbers.